What 90 days of pilot data showed about reserve cost reduction
A 90-day pilot on a live distribution network found an approximately 18% reduction in reserve procurement, with results varying by feeder type.
Read articleNotes on load forecasting, dispatch scheduling, reserve procurement, SCADA integration, and running a distribution network under variable demand.
A 90-day pilot on a live distribution network found an approximately 18% reduction in reserve procurement, with results varying by feeder type.
Read article
Learn how P10/P50/P90 bands support reserve sizing, differ from point forecasts, and help evaluate a forecasting tool.
A practical look at SCADA to EMS integration, including input formats, forecast write-back, and real-time latency.
Persistence works in stable periods but can fail on heat-front transition days, producing large load forecast errors.
A 5% miss on a 200 MW feeder can cost far more than scheduling inconvenience. Here is the reserve procurement calculation.
Not every DSO has a large operations team. The eZap scheduler is designed to give lean operators clear, actionable decisions.
Grid metering data can reveal patterns linked to consumer behavior. Here is how those patterns relate to GDPR duties for your operations team.
Which signals improve medium-voltage feeder forecasts, and which tested features did not earn a place in the model.
Demand's temperature coefficient differs by feeder type. Four weather sources were tested against one another.
A plain-language guide to how distribution operators secure standby generation through procurement, and where those costs escape.
The path from smart meter data to a generation dispatch decision includes more processing stages than most people expect.
Three structural reasons regional operators reserve more power than needed, plus the path to changing that behaviour.