Distribution grid intelligence

Forecast demand. Schedule dispatch. Cut standby power buying.

eZap interprets distribution grid demand and tells your dispatch desk how much generation to schedule, 24 to 72 hours ahead. Avoid reserves that add cost to every bill.

The challenge

Distribution operators buy reserves they may not use

Three structural gaps push reserve procurement costs above necessary levels.

Forecast accuracy gaps

Persistence models miss rapid demand ramps. When summer mornings warm faster than historical patterns, yesterday's load profile is already wrong by 08:00.

Reserve overbuying

Worst-case reserve buying pays for generation that never runs. Distribution operators routinely procure 15-to-25 percent more standby capacity than actual peak demand requires.

Manual schedule delays

Once a planner checks last-hour actuals, recalculates reserve needs, and confirms dispatch, the short-notice window has passed. The correction cost is already fixed.

What eZap delivers

Accurate forecasts. Ready schedules.

Four capabilities for distribution operators handling real-time reserve procurement.

Feeder-level demand forecasts

Each feeder receives a 24 to 72-hour probability distribution, refreshed every 15 minutes as metering data arrives. P10/P50/P90 bands cover every interval.

Automated dispatch planning

For each 30-minute block, your dispatch desk receives a generation schedule ordered by unit cost across the forecast horizon. No spreadsheets. Minutes instead of hours.

SCADA and EMS connections

Connect existing metering through REST and MQTT. No new hardware is needed. Data contracts align with IEC 61968 and common EMS platforms.

Reserve procurement alerts

Threshold alerts identify commitments above the P90 forecast band. Your team sees the issue early enough to adjust before short-notice cost penalties apply.

Under the hood

Metering data to dispatch schedule in three steps

eZap collects grid data, runs the forecast model, and returns a structured schedule your operations team can use immediately.

Metering Data + Weather Feeds IEC 61968 / MQTT eZap Engine Dispatch Schedule Cost-ranked, 30-min 72-hour horizon
From the pilot

90-day closed beta results

18%

Standby reserve procurement cost reduction across 8 instrumented feeders

72 h

72-hour forecast horizon with 15-minute resolution, updated continuously

8

Feeders instrumented across 2 distribution networks in northern Portugal

Internal beta data from 2 distribution networks over a 90-day pilot. Results vary with grid configuration and baseline procurement practices.

From the beta program

What operators are saying

The 72-hour schedule changed how our dispatch team plans the week. We previously carried 20 percent overhead on every reserve commitment because uncertainty was too broad. With eZap's probabilistic bands, we can size procurement correctly while covering the P90 scenario.

Joao Fonseca
Grid Operations Manager, Volta Distribuicao, participant in 90-day closed beta

Before eZap, our planning team spent much of each morning matching the previous night's actuals against the next-day schedule. That comparison now runs automatically, and the alert reaches the inbox before the short-notice procurement window opens. It saves us real money each week.

Sofia Marques
Head of Network Planning, CentroPower, participant in 90-day closed beta
Get started

See what accurate load forecasts mean for your grid

Talk with the eZap team about your feeder network. We will show forecast output against your own data before you commit.